The first section of the Eiffel Tower |
Wednesday, April 30, 2014
Creo Parametrics Update
Wednesday, April 23, 2014
Homework - K'Nex Bridge (Week 4)
The red arrows in the image show where connections were added. The k’nex bridge project in visual analysis is presented unstable. To stabilize the bridge we have to connect joints in a way that the compressive forces are equal to the tension forces. First, we changed the structure type from space frame to plane truss. This tells visual analysis that the bridge is flexible and that it is in a 2D plane. We added connections in certain joints that were in the original bridge. We kept running the model to see which connections made the bridge more stable and where these connections were needed. The best result we got was that the bridge will shift downwards 0.004in when the load is applied. Below is the report view from Visual Analysis. |
Tuesday, April 22, 2014
Monday, April 14, 2014
Project Underway!
So after a short little bump in the beginning, originally designing the Hagia Sophia, the team had to be forced to switch to less sophisticated building.
So our design project will be no other than...
THE EIFFEL TOWER.
More information about our project will come shortly, where we are still getting the kinks out of the scheduling and materials. Also a page will be added to include all important and interesting history and facts about this magnificent tower.
-Luke
Subscribe to:
Posts (Atom)